With electricity in Mud Room, Master Bed Room, Bath, Hood and Outdoor, I have completed all but the Master Bed Room. I am going to install three lights in our old crawl space to add light when doing the plumbing rough-in.
Next week, the electric work, I believe is ready for inspection. I have also to install two land lines for telephone and cable connection.