The preparation work on the addition has been completed except the building permits. Now, we are working on the City Building Permits – studying city building codes and a lot of drawings to do.
Picture one shows part of the retention wall and the gate as well. Picture 2 shows the other part. Picture three shows the fence moving out about a foot with the temporary three-posts tall screen on the side. And picture four is Mom’s flowers bed beyond the retention wall.
Nice!