Preparation Work on Addition Completed, except City Building Permits

The preparation work on the addition has been completed except the building permits. Now, we are working on the City Building Permits – studying city building codes and a lot of drawings to do.
Picture one shows part of the retention wall and the gate as well.  Picture 2 shows the other part.  Picture three shows the fence moving out about a foot with the temporary three-posts tall screen on the side.  And picture four is Mom’s flowers bed beyond the retention wall.